Monday, November 30, 2009

Pokemon Leat Green For Vba Neoseeker

J-4 before the shower!

It takes shape!

Part of the partition is mounted and the shower is ready to be tiled.

Here the flip side:

P1050818

And the side opposite the shower with the small wall to lay the shampoos:

P1050815

Hihi! Only 4 days!

Where To Find A Glory Hole In Losangelesw

Extreme Makeover: bathroom edition

Well, I have not posted anything on Friday night because I told myself that I had all weekend to do is given that construction would resume on Monday morning. Result, I have not posted anything.

So Friday night, the yard looked like this:

P1050800

Ca advance it forward!

The rails are mounted partitions and the shower tray is in place.

P1050804

Go a little picture of Bubu, for fun:

P1050793

To be continued ....

Wednesday, November 25, 2009

Wording For Invitation Card Of Lohri

J-9! PIMP MY BATHROOM

Only 9 days to take a shower!

Tonight, the site of the bathroom is this: a priori, the pipe is almost entirely installed.

P1050778

There are white plaster dust absolutely everywhere! I am tired of cleaning! The craftsman has already scratched the floor present on the walls so the glue adheres better. And this operation produces E-NOR-ME-MENT dust! I was not even in the same room and I was everywhere on the hair and everything!

Bubu's mother told me "I told you that you do not realize it was a job!" ... Yes, we do not realize it was! And fortunately because otherwise we would have never done! lol! Fucking deep in 9 days!!

Tonight we went to shower at my mother, what happiness!

advantage of the mess surrounding and saying it was more than 5 grams of dust around, Bubu has installed spotlights in the hallway: it rocks! ... Er ... despot poudoupoum chii! Ok ... I go out.

P1050769

Monday, November 23, 2009

Denise-milani-wikipedia

: Day 2

Work continues:

P1050751

Installation of furniture:

P1050744

Taken measures and benchmarks:

P1050748

the Bubu Builder:

P1050752

uprooting of the first layer of tiles to Concrete:

P1050750

At the end of the day the "bathroom" looks like this: over bath and sink more! We now need to wash the old, in the kitchen sink!

P1050753

Saturday, November 21, 2009

Green Green Episodes Uncensored

Pimp my bathroom - Day 1: Demolition Men

's it! Work began last!

Front:

P1050720 P1050722

P1050724

When TAPIE handle a mass it gives this:

P1050728

Copie de P1050725

P1050734

P1050729

P1050736

P1050743

P1050735

P1050740