It takes shape!
Part of the partition is mounted and the shower is ready to be tiled.
Here the flip side:
And the side opposite the shower with the small wall to lay the shampoos:
Hihi! Only 4 days!
It takes shape!
Part of the partition is mounted and the shower is ready to be tiled.
Here the flip side:
And the side opposite the shower with the small wall to lay the shampoos:
Hihi! Only 4 days!
Well, I have not posted anything on Friday night because I told myself that I had all weekend to do is given that construction would resume on Monday morning. Result, I have not posted anything.
So Friday night, the yard looked like this:
Ca advance it forward!
The rails are mounted partitions and the shower tray is in place.
Go a little picture of Bubu, for fun:
To be continued ....
Only 9 days to take a shower!
Tonight, the site of the bathroom is this: a priori, the pipe is almost entirely installed.
There are white plaster dust absolutely everywhere! I am tired of cleaning! The craftsman has already scratched the floor present on the walls so the glue adheres better. And this operation produces E-NOR-ME-MENT dust! I was not even in the same room and I was everywhere on the hair and everything!
Bubu's mother told me "I told you that you do not realize it was a job!" ... Yes, we do not realize it was! And fortunately because otherwise we would have never done! lol! Fucking deep in 9 days!!
Tonight we went to shower at my mother, what happiness!
advantage of the mess surrounding and saying it was more than 5 grams of dust around, Bubu has installed spotlights in the hallway: it rocks! ... Er ... despot poudoupoum chii! Ok ... I go out.
Work continues:
Installation of furniture:
Taken measures and benchmarks:
the Bubu Builder:
uprooting of the first layer of tiles to Concrete:
At the end of the day the "bathroom" looks like this: over bath and sink more! We now need to wash the old, in the kitchen sink!
's it! Work began last!
Front:
When TAPIE handle a mass it gives this: