Tuesday, December 15, 2009

What Is The Best Interval Internation Resort?

Pimp my bathroom: the final episode and cliffhanger phew!

voilou! We now enjoy in our bathroom since Friday night!

P1050944

I found a mirror on Saturday but it has not yet hung on the wall:

P1050937

brush was mistaken about the size of the cabinet so that's why there 's a hole on the left (you will receive the new post-holiday so nothing is set permanently):

P1050938

Oops! should I remove this now that yellow sticker on the shower door!

P1050939

P1050940

Now it only remains clean ....

P1050930

P1050924

Knowing we did and sucked the dust or sweep all night!

P1050923

Thursday, December 10, 2009

Miniature Painting Transparent Clothing

Bathroom: end soon!

's it! we can finally home to shower since Sunday night. That's why we do not hear me complain about the past few days!

Here are some photos because the site has progressed well and the bathroom is taking shape.

Firstly, the partition between the bedroom and the bathroom was closed:

P1050901

SDB side it looks like this:

P1050905

spots have been placed:

P1050902

And patching the soil was also:

P1050906

Thursday, December 3, 2009

Helicobacter Pylori Matula Herbal Tea Buy Nz

I can imagine the water running over my head!

Imagine my surprise when I went home just now! The shower doors are mounted!

Well, this does not mean that you can use it because the tiles are not installed. This will normally take a shower Saturday night! Yearh!!

lait

...

Copie de P1050846 ...

Copie de P1050851

Wednesday, December 2, 2009

Craziest Sorority Initiation

Whore 2 days!!

's it! It's official! I HAVE ENOUGH !!!!!

I'm tired of the dust, I'm tired of "camping" at home. I want my shower! I want my sink with a mirror in front so I could primp!

Well, here are photos of the day:

P1050832

P1050834

P1050838

P1050839

P1050841

Tuesday, December 1, 2009

Speeches On Company Anniversary

Pimp My Bathroom: Day 12

Today was fitting tiles to the program. It takes shape ... might as well say that is impatient! And above all, this is our ninth day without a shower!

P1050819

P1050826

Monday, November 30, 2009

Pokemon Leat Green For Vba Neoseeker

J-4 before the shower!

It takes shape!

Part of the partition is mounted and the shower is ready to be tiled.

Here the flip side:

P1050818

And the side opposite the shower with the small wall to lay the shampoos:

P1050815

Hihi! Only 4 days!

Where To Find A Glory Hole In Losangelesw

Extreme Makeover: bathroom edition

Well, I have not posted anything on Friday night because I told myself that I had all weekend to do is given that construction would resume on Monday morning. Result, I have not posted anything.

So Friday night, the yard looked like this:

P1050800

Ca advance it forward!

The rails are mounted partitions and the shower tray is in place.

P1050804

Go a little picture of Bubu, for fun:

P1050793

To be continued ....

Wednesday, November 25, 2009

Wording For Invitation Card Of Lohri

J-9! PIMP MY BATHROOM

Only 9 days to take a shower!

Tonight, the site of the bathroom is this: a priori, the pipe is almost entirely installed.

P1050778

There are white plaster dust absolutely everywhere! I am tired of cleaning! The craftsman has already scratched the floor present on the walls so the glue adheres better. And this operation produces E-NOR-ME-MENT dust! I was not even in the same room and I was everywhere on the hair and everything!

Bubu's mother told me "I told you that you do not realize it was a job!" ... Yes, we do not realize it was! And fortunately because otherwise we would have never done! lol! Fucking deep in 9 days!!

Tonight we went to shower at my mother, what happiness!

advantage of the mess surrounding and saying it was more than 5 grams of dust around, Bubu has installed spotlights in the hallway: it rocks! ... Er ... despot poudoupoum chii! Ok ... I go out.

P1050769

Monday, November 23, 2009

Denise-milani-wikipedia

: Day 2

Work continues:

P1050751

Installation of furniture:

P1050744

Taken measures and benchmarks:

P1050748

the Bubu Builder:

P1050752

uprooting of the first layer of tiles to Concrete:

P1050750

At the end of the day the "bathroom" looks like this: over bath and sink more! We now need to wash the old, in the kitchen sink!

P1050753

Saturday, November 21, 2009

Green Green Episodes Uncensored

Pimp my bathroom - Day 1: Demolition Men

's it! Work began last!

Front:

P1050720 P1050722

P1050724

When TAPIE handle a mass it gives this:

P1050728

Copie de P1050725

P1050734

P1050729

P1050736

P1050743

P1050735

P1050740